High-Power Isolator and Pump Combiner Integration Checklist
This checklist covers the three integration interfaces for a high-power optical isolator and a pump combiner in one fiber laser build: package mounting, pigtail splicing and connector end-face inspection. Thermal selection is covered separately in the high-power optical isolator selection guide; each item below states what to confirm during engineering review.
What does this integration checklist cover — and what does it not cover?
This guide covers only the integration checks where an isolator and a combiner meet in one assembly: how the packages are mounted, how the pigtails are spliced into the optical chain, and how the connector end faces are inspected. It does not repeat the thermal selection table for high-power isolators. Cooling method, temperature, flow, pressure and condensation controls must follow the approved package drawing and engineering confirmation for the selected model, as set out in the high-power optical isolator selection guide.
The checklist below uses only listed package and fiber data for Model 063, Model 064, Model 065 and the high-power isolator models. Anything not listed on a product specification — including splice procedure details and mounting torque — must be confirmed during engineering review, not assumed from this page.
Integration checklist: isolator and pump combiner in one build
Work through the three groups in order. Each row states the listed data behind the check; where no listed value exists, the row says so.
| Check | What to confirm | Listed data |
|---|---|---|
| 1. Package mounting and fixing — mounting space | Confirm the mounting space and cooling available for the selected package before quotation. Package choice and thermal requirements are confirmed during engineering review; package codes alone do not establish a total power rating. | Pump combiner selection guide: specify the selected fiber configuration, power per pump port, mounting space and cooling available. |
| 1. Package mounting and fixing — combiner package options | Confirm the package option against the available mounting space. Model 063 lists package options from D1 (dia. 4.0 x 60 mm) to D7 (100 x 28 x 12.6 mm, HP). Model 064 lists D1 (dia. 4.0 x 60 mm) and D3 (70 x 12 x 8 mm). Model 065 lists D6, D7 or customized packages, with dimensions confirmed during engineering review. | Model 063, Model 064 and Model 065 product specifications. |
| 1. Package mounting and fixing — free-space isolator mounting | For free-space isolator designs, confirm aperture, beam condition and mounting requirements with engineering. | High-power optical isolator selection guide. |
| 2. Pigtail splicing — fiber chain as one system | Review the pump input fiber, signal fiber when applicable, and output fiber as one optical chain. Core and cladding dimensions, numerical aperture, wavelength bands and power cannot be selected independently. | N×1 vs (6+1)×1 pump combiner selection guide. |
| 2. Pigtail splicing — signal fiber match | In a (6+1)×1 combiner, the center port is a signal fiber matched to the seed and gain fiber (PM Panda in Model 065), while the six outer ports are multimode pump fibers. In a (2+1)×1 combiner, the signal port uses PM Panda fiber aligned to the slow axis. | N×1 vs (6+1)×1 guide; Model 064 and Model 065 product specifications. |
| 2. Pigtail splicing — splice preference and pigtail length | Record the package, pigtail length, connector or splice preference, and quantity as configuration information for engineering review. Splice procedure and splice acceptance values are not listed on a product specification; confirm them during engineering review. | N×1 vs (6+1)×1 guide configuration table. |
| 3. Connector end-face inspection — FAT end-face record | Check the serialized Factory Acceptance Test (FAT) report for each device before installation. Every device ships with an individual, serialized FAT report containing calibrated insertion loss scans, extinction ratio measurements, high-power return loss data, and 400x fiber end-face interferometry. | Passive fiber component cross-reference guide. |
| 3. Connector end-face inspection — connector type and key orientation | Confirm the connector type and polarization-axis orientation relative to the connector key during engineering review. No connector acceptance value is listed on the combiner product specifications; do not assume one from another model. | Confirm during engineering review. |
What information should accompany an integration question?
Send the port configuration, pump and signal wavelength, pump fiber core/cladding/NA, signal fiber (PM or not), output/active fiber, power per pump port and total, package, pigtail and quantity. Unknown items can be left blank for engineering review; the response should identify which remaining items require engineering confirmation before quotation.
Frequently Asked Engineering Questions (FAQ)
Does this checklist replace the thermal selection table for high-power isolators?
No. Thermal selection — including the cooling method for each power band — is covered in the high-power optical isolator selection guide. This checklist covers only package mounting, pigtail splicing and connector end-face inspection.
What should be checked on the connector end face before installation?
Check the serialized Factory Acceptance Test (FAT) report for each device. Every device ships with an individual, serialized FAT report containing calibrated insertion loss scans, extinction ratio measurements, high-power return loss data, and 400x fiber end-face interferometry.
Can the pigtail length and connector choice be changed?
Package, pigtail length, connector or splice preference are part of the configuration information reviewed with engineering. Custom pigtail lengths (0.5 m to 10 m+) are configured per build; confirm the length, connector type and key orientation during engineering review.
What information should accompany an integration question?
Provide the port configuration, pump and signal wavelength, pump fiber core/cladding/NA, signal fiber (PM or not), output/active fiber, power per pump port and total, package, pigtail and quantity. Unconfirmed details can be identified during engineering review.